Loading...
Checkoff Sheet MS-2014-01441.tif (i CITE ° IF ALAI. RE WOOFING C HECKOFF SHEET ! Return to Blair City Hall prior to Final inspection i 218 $ je Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to 'pgrform detailed Inspections which would no Interfere with reroofing woOk, please; indicate compltanae with the following requirements foilowino this reroofing job, Permim I Installation Data: \Z_&, C% l l edo� on lL�l 7 1 )7177 - 00- i j YE NO )K The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) Q tOE pROTgCTIO IN ALLED: An ice barrier that consists of at least two layers of underlayment or aself- adhering polymer modified bitumen sheet was installed and o, extends "thebull m the eave's edge to a point at least 24 inches Inside the exterior wall line ding. (8905.23.1) B'TRU,CTURAL. G MpONENTS ARE SOUND: The structural roof components are capable of suppo 'ng the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (R907.2) [� EXtSfiNG COV&RING wAS REMOVE Existing roof covering was removed for one of the reasons required by section R907.3 f NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars of metal counter - flashing we re not reinstalled If rusted. (11907.5) 1 FLASHING INS_'ALLED PROPERLY: Flashing shall be reconstructed in accordance with approved rnanufacturees installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Lin Si tune of Primary Installer ' Date � Date Signature of it � Hol r r i