Checkoff Sheet MS-2014-01303.tif i
i
2009 INTERNATIONAL RESIDENTIAL CODE
j
CI TY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
218 S 16 Street, Blair, NE 68008
Because of limitatlons caused by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work, please Indicate compliance with the following requirements
iPoilowing this reroofing job.
Permit #: l Quality First Roofing
3716 D Street i
Omaha, NE 68107
Installation Date: 402= 206 -2244
YES NO
i
j
l The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1) j
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of j
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edcl to a point at least 24 inc inside the exterior
wail line of the building. (R905.2.7.1)
i
STRUCTURAL COMPONENTS ARE SOUND; The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (R907,2)
i
F- XISTING COVERING WAS REMOVED. Existing roof covering was removed for one i
of the reasons required by section 8907:3
No RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, cellars or metal counter - flashing were not reinstalled if rusted. (R907.5)
1
1
i,
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's Installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of Primary, Installer Date
Sign ` o er Date
j
i