Checkoff Sheet MS-2014-01262.tif Feb, 5, 201 No, 2154 P. 1 9.13AM BradCo Company
IN TERNATI ONAL
CITY OF BLAIR REROOFING T
Return to Blair City Hall prier to FinaClnapection
218 S 16 Street, Blair, NE 6 8008
Because of limitations caused by the infeasibility) to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job,
Property; Address;
► 3 5 pr � l i p � C�o lrivic� t ltc� i
_ 12_y. 7r— i3 z, ot AE
Contractor or Homeowner (if self)
Permit #: MS-2014- () 17 - ( 0
Installation Date. vs ZC)14 _
YES NO
L ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirement`s of the building code, (11907.1)
❑ ICE PRO =CTIaN INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 4 inches inside the exterior
wall line of the building. (ROO5.2.7.1)
❑ STRUCTURAL COMPONENTS ARC SOUND:. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING comrRINe WAS REMOVED:_ )existing roof covering was removed for one
of the reasons required by section R907,6
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing. ventffashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (11907.5)
�❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
biturnipecd materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of Prirnary installer Dafe
- 1 1A _
Signature of Permit older Date