Checkoff Sheet MS-2014-00891.tif f 1HK L- bl�y eJ: t�t> From: 10;
RESPAU"EN CODE
I• � L I . REROUNG
Return to Blair City Hall prior W Final Inspection
21 1 Street, Blair, NE 6800
Secauso of limitations caused by the infeasibllity to perform detailed Inspections which would �
not interfere with reroofing work, please indicate compliance with the f+oIl+owing requiretiients
Allowing this ]reroofing job.
P r operty Address:
Contractor or Homeowner (if self
Permit #: Mils 2014- /
Installation data:
Ylv NO
Tho materlala and methods of application used for recovering or replaQing they existing,
roof covering comply with the requirements of the building code. (R907A)
ICE PkOfECTION INSTILLED An ice barrier that consists of at bast two layers of
underlayment or of a self polymer modified bitumen sheet was installed and
extends at least from the eave's edge to -a point at least 24 inches inside the exterior
• well lire of tha building. (R906.2.7.1)
STRUCTURAL COMPONENTS ARE OUNO: The struotural roof components are �
capable of supporting the roof covering systoni and the material brad equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof Covering was remover] for 'one
of the reasons required by section 8907:3
CID NOT USE RUSTED METAL l;]&FLASHING: Existing vent flashing, metal edges,
drain outrets, collars or Metal counter - flashing were not reinstalled if rusted, (R907.5)
FLASHING INSTALLE PROPERLY"- Flashing shall be reconstructed in accordance
with approved manufacturer's installation' instructions, Metal flashing to which
bituminous materials are to be adhered shall be printed prior to installation, (11007.6)
3z_ �
Signet rimary l ristaudP , Date
8191 ure 6ffre r it Holder Date