Loading...
Checkoff Sheet MS-2014-00890.tif i MHK- i'_b -eWW'J e6: t�b From: 1 o:4ae4eb41 F'. b.-b 2`009 INTERN r T I. RER00F Return to Blair City Hall prier toy Final Inspection j 218 16 Street, B lair, NE 88808 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with tho following requirements 'follo this reroofing job. Property Address: a ` Contractor or Homeowner (if self] Permit #: MS-2 014- ?C lnstallatfon Dat a { i ;,;f Y> - No Tho materials and methods of application used for recovering or replacing the existing roof covering complywith the requirements of the building code'. (R907.1) ICE MOtEGTION_IN An lee barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edg to •a paint at least 24 inches inside the exterior • wall line of the building. (8905.2.7.1) Ada STRUCTURAL COMPONENTS ARE SOUND The structural roof components are capable of supporting the roof covering systeril and the material knd equipment loads that will be encountered during Installation of the roof covering systam. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE- RUSTED METAL OR I= L.A HING.- Existing vent flashing, metal edges, drain a utPets, collars or metal counter-flashing were not reinstalled if rusted. (899715) FLASHING INSTALLED PROPERLY shall be. reconstructed in accordance with approved manufacturer's installation Instructlons. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.$), I 8 gnature of rimary Ins [date Signature of Permit Holder pate 1 i