Loading...
Checkoff Sheet MS-2014-00847.tif i Feb 041511:06a Weatherguard, Inca 402 - 289 -4345 p.2 20" INTERNATIONAL RESIDENTIAL COM I CITY OF BLAIR CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68 008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate carnpliance with the following requirements following this reroofing job. Z` Property Address: Contractor or Homeowner (if self) : `�` ,;, Permit #: MS -201 4r N Installation Data; YE NO The materials and methods of application used for recovering or replacing the existing roof covering comp[ywith the requirements of the building code. (RG07,'I) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior • wall line of the building. (RW5.2.7.1) ' ® STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will he encountered during installation of the roof covering system. (8907.2) FXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ® DID NOT USE RUSTED METAL OR FLASHING: Existing vent :flashing, metal edges, drain outlets, ccli;�rs or metal counter flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY-.' shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which tumi oa• Materials are t o be adhered shall be primed prior to installation. (8947.6) Signat re of Pndrnaly Installer Date Signa ure 6f Permit Holder Date . I I I