Loading...
Checkoff Sheet MS-2014-01174.tif 2009. INTERNATIONAL RESIDENTIAL COD. CITY OF BLAIR REROOI~II G CHECKOFF SHEET Return to Blair C i t y Hall prior to Final Inspection 2'18 S 16 Street, Blair, NB 68008 Because of [imitations caused by the infeasibility to perform detailed inspections which would j not interfere with reroofing work, please indicate compliance with the following requirements followI this reroofing job. Property Address:.I t c =' w Contractor or Homeowner (if sett : '��'�`.�� -:� Permit #: MS- 2014- w -- Installation Date: YES NO �` ❑ _ ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) I ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior • wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are f capable of supporting the roof covering system and the material and equipment loads that will be encountered During installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturers installation instructions. Metal flashing to which bituminous Materials are to be adhered shall be primed prior to installation. (R907.6) _ Signature of Primary nstalle Date Date