CITY OF BLAIR REROOI~II G CHECKOFF SHEET
Return to Blair C i t y Hall prior to Final Inspection
2'18 S 16 Street, Blair, NB 68008
Because of [imitations caused by the infeasibility to perform detailed inspections which would j
not interfere with reroofing work, please indicate compliance with the following requirements
followI this reroofing job.
Property Address:.I t c =' w
Contractor or Homeowner (if sett : '��'�`.�� -:�
Permit #: MS- 2014- w
--
Installation Date:
YES NO
�` ❑ _ ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
I
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to -a point at least 24 inches inside the exterior
• wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are f
capable of supporting the roof covering system and the material and equipment loads
that will be encountered During installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑ DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturers installation instructions. Metal flashing to which
bituminous Materials are to be adhered shall be primed prior to installation. (R907.6)