Loading...
Checkoff Sheet MS-2014-01161.tif I, I CITY OF BLAIR REROOFING CHECKOFF SHEET � Return to Blair C Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. i Property Address Contractor or Homeowner (if self) . ` . .�'t+ C p °a Permit #: IIVIS -2014- C) I i I Installation Date: 2, t fi YES NO "I ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge_ to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) i I ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing.vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous material are to b adhered shall be primed prior to installation. (R907.0) i r.. Signature of of�Prim nstal Date ure o�ermifi o dL-r- Date I