Checkoff Sheet MS-2014-00897 (2).tif 2009. INTERNATIONAL RESIDENTIAL COD.
CITY OF GLAIR REROOFIl CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection j
218 S 16 Street, Blair, NE 68008
i
Because of limitations caused by the infeasibility to perform detailed inspections which would ( i
not interfere with reroofing work, please indicate compliance with the following requirements j
following this reroofing job.
Property Address:
Contractor or Homeowner (if self) : 3
k
Permit #: MS -2014-
Instailation Date-. ' `r
' i
YES NO
_ ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907A)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to -a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
If'`' ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
' of the reasons required by section R907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal cpunter- flashing were not reinstalled if rusted. (8907.5)
IJ ❑
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Date i
tg
at re ma ��stalle
I
Signature of Permit older Date
. i