Loading...
Checkoff Sheet MS-2014-00897 (2).tif 2009. INTERNATIONAL RESIDENTIAL COD. CITY OF GLAIR REROOFIl CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection j 218 S 16 Street, Blair, NE 68008 i Because of limitations caused by the infeasibility to perform detailed inspections which would ( i not interfere with reroofing work, please indicate compliance with the following requirements j following this reroofing job. Property Address: Contractor or Homeowner (if self) : 3 k Permit #: MS -2014- Instailation Date-. ' `r ' i YES NO _ ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) If'`' ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one ' of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal cpunter- flashing were not reinstalled if rusted. (8907.5) IJ ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Date i tg at re ma ��stalle I Signature of Permit older Date . i