Checkoff Sheet MS-2014-02407 (2).tif 2009. INTERNATIONAL RES IDENTIAL COD.
CITY OF 13LAIR RER®CFWG CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S '16 Street, Blair, NB 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work please indicate compliance with the following requirements
following this reroofing job.
Property Address:(
Contractor or Homeowner (if self) : bi Cg
Permit #: MS -201 C � ;
Installation Date: t V [
YES NO
_ ❑ The materials and methods of application used far recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907A)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to -a point at least 24 inches inside the exterior
• wall line of the building. (R905.2.7.1)
' STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
L7 DIES NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
<' drain outlets, collars or metal counter- flashing wore not reinstalled if rusted. (8907.5)
I l� FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous rrlater124, are fb be adhered shall be primed prior to installation. (R907.6)
Signature: o f I?rirrr ry nsfaller Date
a
natu rm . er Date