Checkoff Sheet MS-2014-03122.tif I T N. TI
2009 ON
AL SI NTI
CITY OF BLAIR REROOFING CHECKOFF , HET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this. reroofing job.
I �
. I
Property Address: r� �1
Contractor or Homeowner (if self)
Permit #: MS- 2014 -
Installation Date: ►�,� 1
I
YES NO �
(;� ❑ ecovering or replacing the existing
The materials and methods of application used for r
roof covering comply with the requirements ofthe building code.
.(R907.1)
I
J ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
f underY la ment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are
capable of supporting the roof covering. system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous: materials are to be adhered shall be primed prior to installation. (R907.6)
Signature °of Primary nstaller Date
SigatuCe o
Date
older