Loading...
Checkoff Sheet MS-2014-03122.tif I T N. TI 2009 ON AL SI NTI CITY OF BLAIR REROOFING CHECKOFF , HET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this. reroofing job. I � . I Property Address: r� �1 Contractor or Homeowner (if self) Permit #: MS- 2014 - Installation Date: ►�,� 1 I YES NO � (;� ❑ ecovering or replacing the existing The materials and methods of application used for r roof covering comply with the requirements ofthe building code. .(R907.1) I J ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of f underY la ment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are capable of supporting the roof covering. system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous: materials are to be adhered shall be primed prior to installation. (R907.6) Signature °of Primary nstaller Date SigatuCe o Date older