Loading...
Checkoff Sheet MS-2014-00758.tif INTERNATIONAL CODE IT BL AIR IN CHECKOFF Return to Blair City Hall prior to Final Inspection 27 8 S i 6 Street, Blair, NB 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following following this reroofing job. Permit #: _ Installation Date: 1 YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of u rid eriayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVER 1 M(; WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) in FLASH ING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous ateriais are to be adhered shall be primed prior to installation. (R907.6) w a_ Signature o rimary Installer Date Date Signature of Permit Holder