Loading...
Checkoff Sheet MS-2014-02203.tif I 01/27/2015 08:57 7790112 GOEDEN CONSTRUCTION PAGE 01 % 009 INTERNATIONAL RESIDENTIAL CODE CITY QF BLAIR Return to Blair City Hall prior to Final inspection 290 S, 16 Street, Blair, NE 08008 Because of liimitations caused by the infeasibility to perform detailed inspections which would riot Interfere with reroofing work, please Indicate compliance with the following requirements kffMLU this reroofing job. Property Address: Contractor or Homeowner (if self) pl°t y Permit #: MS-2014- ) C Installation Date: /6 / YEAS NO The materials and methods of application used for recovering or replacing the existing roof covering pomply with the requirements of the building cede. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the e ve's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7,1) S RUCTURAL COMPONENTS NTS ARE= SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment leads that will be encountered diAnn !hQf infInn t f +K __-r .,.,.. ā€”iā€” I i X_ISTINU COVERING WAS REMOVED. Existing roof covering was removed for one of the reasons required by section 8007.3 DID NOT USE RUSTED METAL OR ELASHINIG: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) FLASHING IN TALLER PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitum' ous materials are to be adhered shall be primed prior to installation. (13907.6) Signature o ri rory Installer pat Signature Permit alder pate ! I i