Checkoff Sheet MS-2014-02203.tif I
01/27/2015 08:57 7790112 GOEDEN CONSTRUCTION PAGE 01
% 009 INTERNATIONAL RESIDENTIAL CODE
CITY QF BLAIR
Return to Blair City Hall prior to Final inspection
290 S, 16 Street, Blair, NE 08008
Because of liimitations caused by the infeasibility to perform detailed inspections which would
riot Interfere with reroofing work, please Indicate compliance with the following requirements
kffMLU this reroofing job.
Property Address:
Contractor or Homeowner (if self) pl°t y
Permit #: MS-2014- ) C
Installation Date: /6 /
YEAS NO
The materials and methods of application used for recovering or replacing the existing
roof covering pomply with the requirements of the building cede. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the e ve's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7,1)
S RUCTURAL COMPONENTS NTS ARE= SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment leads
that will be encountered diAnn !hQf infInn t f +K __-r .,.,.. āiā
I
i
X_ISTINU COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section 8007.3
DID NOT USE RUSTED METAL OR ELASHINIG: Existing vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5)
FLASHING IN TALLER PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitum' ous materials are to be adhered shall be primed prior to installation. (13907.6)
Signature o ri rory Installer pat
Signature Permit alder pate
!
I
i