Checkoff Sheet MS-2014-01728.tif i
I
i
I
2009 INTERNATIONAL RESIDENTIAL: ODF
GIB Y OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 th Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
ioliowin n this reroofing Job.
� J /�
Permit#:
Installation Date:
y
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
d ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 Inches inside the exterior
wall line of the building. (R905.2.7.1)
d STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED• Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (11907.5)
® FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (R907.6)
Sign ' of Pr' ary Installer Date
Date
Signat of Permit Holder