Loading...
Checkoff Sheet MS-2014-01372.tif i i . I � i .009 INTERNATIONAL RESIDENTIAL CODE C11Y OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 th Street, Blair, NE 68008 i Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements io this reroofing job. Permit #: �' �✓ f �� °�" Installation Date: - -L�- -I YE NO � The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) [� [� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) [� ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 (� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ® FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) ` I � Installer f �� Sign ' of Pr' ary Daie r Signat of Permit Holder Date i