Loading...
Checkoff Sheet MS-2014-02465.tif Jan 23 2015 3:40PM HP Fax page 3 2009INTERNATIONAL RESIDENTIAL . F CITY OF BLAI Return to Blair City Hall prior t® Final Inspection 218 816' Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing word, please Indicate compliance with the following requirements following this reroofing job. Property Address.` Contractor or Homeowner (if self) ; , w✓t�S� i Permit t: IVIS- 2014- Qz 4V� .S� _ i installation Date; YES NO j The materials and methods of application used. fqr recovering or replacing the existing roof.covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet installed and extends at least from the eave's edge to -a point at least 24 Inc_ hes inside the exterior wait line of the building.- (R906.2.7.1) a RUGTQRAL<CCIMFON NTS ARE SOUND, The`structural roof components are capable ofsupporl ng the roof coves dng.,system and the material and* equipment loads that will be enceunfered during installation of the roof covering system. (R907.2) i EXISTING COVERING WAS REMOVED-, Existing fQof covering was removed for one � of the reasons, required, by section R907.3 mo NOT USE RUSTED METAL OR FLASHING; Existing vent fashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) j FLASHING INSTALLED PROPERLY: [=lashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Prim tai p i X�' -3_ ,C5 Signature of Permit old ©ale I