Loading...
Checkoff Sheet MS-2014-01489.tif Jan 23 15 09:35a Allison Blaich 402 - 933 -2995 p.1 t L. Ktb1UtN1_1AL CODE CITY OF BLAIR HECK H Retdrn to Blair City Hall prior to Final inspection 218 S 16 Street, Nair, NE 68008 Because of limitations caused by the infeasibility to Perform detailed 1nspe6t1pns which would not interfere with reroofing wort, please indicate compliance with the following requirements following this-reroofing job. Properly Address: Contractor or Homeowner (if selq : ( Le,�e Permit #: MS -2014. Installation Date: YES NO r The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements 'of the building code. (R907.1) ! ® ICE PROTECTION INSTALLED An ice barrier that consists of at (east two layers of underlayment or of a self-adhering polymeir modified bitumen sheet was installed and extends at least from the cave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENT,9 ARE •S.OUND: The st c= ru aural roof components are capable of supporting the roof covering, system and the material and equipment toads that will be endountbred during installation of the roof covering'system. (11907.2) EXISTING COVERING 'WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 0,907.3 ` DID -NOT USE DUSTED METAL OIL FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were' not reinstalled if rusted. (11907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance: with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed priorto installation. (11907.6) Signature of Primary 1 taller Dat Signattire of Permifi Holder _ I I