Checkoff Sheet MS-2014-00462.tif i
I
i
Jan. 23. 2015 1,19PM No. 1829 P. 2
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF LAI , REROOF190 CHECKO T
Return to Blair Cit H prior to Final I nspection
218 S 16 Street, Wair, NE 680O8
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing job.
i
Property Address: , -
Co or Horneownor (if self} ; L
Permit #i MS-2014- ,
Installation Date: , 2- o l
Y ES NO
`P _ 13 The materials and methods of application used for recovering or replacing the exlstincg
roof covering comply with the requirements of the building code, (8907A)
TP IcE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self"adherinrg polymer modified bitumen sheet was Installed and
extends at least from the eave's edge. to •a point at least 24 inches inside the exterior
wall line of the building. (FW5.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering systerri and the material and equipment loads
that will be encountered during Installation of'the roof covering system, (13907.2)
EXISTING COVERING WAS REMOVED:. Existing roof covering was removed for one
of the reasons required by section 13907.3
I� DID NOT USE. RUSTED METAL OR FLASH[ Existing vent flashing, metal edges,
drain outlets, collars or metal counter flashing were not reinstalled if rusted. (E907.5)
. FLASHING INSTALLED PROPERLY C' Flashing shall be reconstructed in accordance
with approved manufacturer's installatior,) instructions. Metal flashing to which
W mino materials are to be adhered shall be primed prior to installation. (13907.6)
oo
i naf of rlmary ln taller Date - -- -
8ignat a of Permit R br Date
-
. i
- - 1