Loading...
Checkoff Sheet MS-2014-00414.tif i Jan 23 2015 3 :40PM HP Fax page 1 2009 INFER"'NATIONAL RESIDENTIAL CODE— CITY OF BLAIR REROOP19 CHECKOFF SHEET Return to Blair City all prior tb F inal Inspection 218 S 16 Street. Blair, NE 68088 Because of limitations caused by the lnfeaslblllty to perform detailed inspections which would i not Interfere with reroofing work, please Indicate compliance with the following requirements following this reroofing job. Property Address: � Contractor or Homeowner if sel j Permit #: M-20114- G.. Installati n Date. i YES NO The materials and methods of application used for recovering or replaying the existing roof covering gomply with the requirements of the, building code. (R907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge to a point at least 24 inches Inside the exterior wall line of the building. (8905,2.7.1) STRUCTURAL COMPONENTS ARE SOUND The structural roof components are f capable of supporting the roof covering systerri and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2). EXISTING COVERING WAS REMOVED: Existing roof covering was removed for brie of.the reasons; required by section R907.3 . DID NOT USE RllSTED METAL OR FLASHING Existing vent flashing, metal edges, drain outlets, collars or metal epunier- flashing were not reinstalled W rusted. (11907:6) FLASHiNQ INSTALLED PROP ERI..Y; Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature f Prim I a er_ Date Signature of Permit of Date 4./ ° L11