Checkoff Sheet MS-2014-00354.tif i
Jan 23 2015 3:40PM HP Fax page 2
r-009 INTERN T
RESIDEN
C ITY OFI R A IR R ER O O P I NG
KOPF SHEET
Return to lair City Hall prior to Final' inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not Interfere with reroofing wort{, please indicate compliance with the following requirements
following this reroofing job.
Property Address: 6-
Contractor or Homeowner (if self):
Permit #a MS- 2014 -. d o L•I
installatlon mate: "
YE NO
The materials and methods of application used.for recovering or replacing the existing
ro.o cdvering comply with, the requirements of the building.aode. ( 907:1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a.self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to •a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUDTURAL.GOMPONENTS ARE SOUND: The structural roof components are
capable of supporltng the roof covering systerri and the material and equipment loads
that will be encountered during installation of the roof cove
overing system. (R007.2)
EXISTING. COVERING-WAS REMOVED: Existing rpof covering was removed for one
of the. reasons required by section 8907.3
DID NOT USE`RU§TED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars :or metal 6punter- flashing were riot reinstalled if rusted. (R907.5)
- I;LAS.HING INSTALLED PROPERLY. Flashing shall be in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
AM �3 ® >r
Signature of PrharPnoller Date
Signature of Permlt Hoi®r
Date
I,