Loading...
Checkoff Sheet MS-2014-00354.tif i Jan 23 2015 3:40PM HP Fax page 2 r-009 INTERN T RESIDEN C ITY OFI R A IR R ER O O P I NG KOPF SHEET Return to lair City Hall prior to Final' inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not Interfere with reroofing wort{, please indicate compliance with the following requirements following this reroofing job. Property Address: 6- Contractor or Homeowner (if self): Permit #a MS- 2014 -. d o L•I installatlon mate: " YE NO The materials and methods of application used.for recovering or replacing the existing ro.o cdvering comply with, the requirements of the building.aode. ( 907:1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a.self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to •a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUDTURAL.GOMPONENTS ARE SOUND: The structural roof components are capable of supporltng the roof covering systerri and the material and equipment loads that will be encountered during installation of the roof cove overing system. (R007.2) EXISTING. COVERING-WAS REMOVED: Existing rpof covering was removed for one of the. reasons required by section 8907.3 DID NOT USE`RU§TED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars :or metal 6punter- flashing were riot reinstalled if rusted. (R907.5) - I;LAS.HING INSTALLED PROPERLY. Flashing shall be in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) AM �3 ® >r Signature of PrharPnoller Date Signature of Permlt Hoi®r Date I,