Loading...
Checkoff Sheet MS-2014-01797.tif i 2009 INTERNATIONAL RESIDENTIAL. CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. p Permit #• ,�� / Installation Date: 1-5 i YE,B' NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underiayment or of a self - adhering polymer modified bitumen sheet was installed_ and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) [� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (R907.2) (� ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ NO RUSTED METAL OR FLASHINGs Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (11907.5) ® FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) ; Sign ' of Pr ary Installer 5 Date Signat of Permit Holder Date i