Loading...
1482_0001 (5).tif 12/11/2014 THU 11:06 FAX U002/002 j I I I i I HEREBY ATTESTTHAT THE FOLLOWING TEST REQUIRE- MENTON THE 2 PSIG GAS PIPING SYSTEM AT: i STREET t> rip CITY STATE I HAS BEEN MET OR EXCEEDED: } "PRIOR TO THE INSTALLATION OF ANY FUEL AE OR APPLIANCE REGULATORS, CAP AND SEAL THE PIPING SYSTEM(S), AND TEST WITH AIR AT A PRESSURE OF 10 PSIG FOR AT LEAST SO MINUTES, AFTER COMPLETION ON THE AIR TEST, INSTALL THE 4 NECESSARY REGULATORS .. AND SOAP TEST ALL CONNECTIONS FOR LEAKAGE" w CONTRACTOR INSTALLER W IJATE IN- MfwkMills&ergy r " g rwme W FORM 48- 6151(14/09) f i