Checkoff Sheet MS-2014-02814.tif i
i
01- 05 -'15 14;13 FROM- Absolute Customs T -258 P0004/0020 F -296
i
2009 INTERNATIONAL RESI TIAL CODE
CITY OF BEAD. REROOFING CHECKOFF SHEET
Return to sialir city Hal[ prior to Final ilnsPectic)n ;
218 8 10' Street, Moir, NE 68000
0ecause of line fa4ions caused by the infeasibility to perfortu datailed Inspections Whiob Would
tt interfere with reroofing work, please indicate compliance with the following requirements
fgg2y inci - this reroofing job.
Permit 4.
Installation faire:
YES No
The materials and methods of appiioation usecl for recovering or replacing the existing
roof covering comply with the requirements of the building cote. (11907.1)
lol O'I'EOTH0iri l § AL_. An ice barrier that Wrialsts of at least two layers of
underlayment or of a self-adhering polymer modified Vitumen sheet was installed and
extends at least ue
from the ag's ed a to a point at lent sin ide the exterior
wall line of the building. (R@U5.2.7.1)
. TRUCE UPUL Cob [71ivFW - rS ARE SOUND The structural roof components are
capable of supporting the roof covering systel and the material and equipment reads
that will be encountered during installation of the roof oovsring systern. (11907.2)
EJi1;3TlNCOVE
RING WV _ FZgMoVED, Existing roof covering was removed for one
of the reasons required by section 8907.3
t US"t Ea IV {Ei' og LASHING l= xisting vent flashing, metal edges. drain
outlets, collars or metal oounter- flashing were not reinstalled if rusted. (R907.5)
( LAA 1 1111 l TALLI =o PF P RLY: Flashing ehali be reconstructed in accordance
with approved manufacturer's installation instructims. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Si ature of Primary installer Date
\A
SWttiature of armit Holder Date