Loading...
Checkoff Sheet MS-2014-02111.tif i 01- 05 -'15 14:15 FROM- Absolute Customs T -258 P0008/0020 F -296 2009 INTERNATIONAL RESIDENT �`I L CURE if OF BL REROOFING CHE CKOFF SHEEN" Return to Blair City Full prior to Final I 21g 8 tro Street, Blair, NE 68008 Because of Cirnitations causal by the infeasibility to perform dstalled inspectiOns which would Mol interfere with reroofing work, please Indicate eompliancO with fhe frallowirig requirements fqUgMd this reroofing job. ii yy .1t n b Permit 9• Installation plate; YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (119071) ® ICE PPICITECTION IN TALLER: An lee barrier that consists Of at least two layers of underlayment or of a self-adhering polymer modified biturrian sheet was _ installed and extends at least fro the cave's ed a to a point at least 24 inched lnsid the exterior wall line of the building. (RU05,2.7.1) STRUCTURAL COMPONENTS ARE SOUMD;. structural roof components are ( capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® p_) COV1 =l CN L8 REWI -VI=D: E- Asting roof covering was removed for one of the reasons required by section 0907.3 -ID RUSTED Mg - TAC_ O EL.A 1- ING. F-Asting vent flashing, metal edges, :*train outlets, collars or metal counter slashing were not reinstalled if rusted. (R907.5) > LAS IMC INSTALLED F OFD LY: Flashing shall be reconstructed in acoordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R9O7.6) 1 „ jin ature: of Primary Instal er L7a e � lJ � atNro ermi t l older Qate