Loading...
Checkoff Sheet MS-2014-01992.tif i i 01- 05 -'15 14,15 FROM- Absolute Customs T -258 P0009/0020 F -296 2009 INTERNATIONAL RESq `I L CODE C ITY OF BEAD. REROOFING CHECKOFF SHEEN' Return to Blair city Hall prior to Fogel Rnspectlon 10 8 16 street, Blair, NE 60000 i3ecause of limitations caused by the infeasibility to pefform dotailed InsPections Which uvourd not interfere with reroofing work, please indicate 001,1plianea wi th the following requirements #ollowlM this feroofin+g joie. -�` I on - 1 Part 9: Installation L7a'EeV YES no The materials and methods of application used for recovering or repla+cCrtg the existing roof covering comply with the requirements of the building code, (119071) ICE PRt]TECTCQN litaTALLED !fin ice. barrier that Consists of at least two layers of underlayment or of a self-adhering po mod ified bitumen Sheet was In fastened utrd extends at lea t from the eays' ed a to a point at least 24 ino� as inside the exterior wall line of the building. (R905.2,7. I) T ii; tat;Tup,A .. co Powe4 -`S ARE Sot!ND: The structural TOOT +components are capable of supporting the roof covering system andthc material and equipment loads that will bs encountered during installation of the roof covering system. (8907 -2) F= )'U'f'l IOVEU. Existing roof covering was removed for one of the reasons required by section 11907.3 NO RUSTED WIE'1' !. Ct1 FC_, LsHING: Existing vent flashing, metal edges, drain .outlets, collars or metal oaunter flashing were riot rairistaiied if rusted. (11947.5) FLASHING iING ( 57 AL�.Fp Eagp Lit': Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which biturninous materials are to be adhered shall be iarimed prior to installation. (Rg07.6) I r 4 81anature d of Primary Installer date �( ^igrtakur+ of ormit Haider as