Loading...
Checkoff Sheet MS-2014-01846.tif T l ON A L SIDE TIAL CODE - 200 INTERN A T CITY' OF BLAIR. REROOFING CHECKOFF SHE Return to Blair C y Hall prior to Final inspection 218 S 16t Street, Blair, NE 88888 j Because of limitations caused b the infeasibility to *perform detailed inspections which would by Because interfere with reroofing work, please indicate compliance with the following requirements fogowin this reroofing job. i Permit #: .� D Installation Date: YES .NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i layers of' Q ICE PROTECTION INSTALLED: An ice barrier that consists sheet wasinsta led and underlayment or of a self - adhering polymer modified bitumen .- ---- -- , extends at least from t cave's ed s to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) I STRUCTURAL COMPONENTS ARE SOUND: The �e m teriai na equipment loads capable of supporting the roof covering system and t that will be encountered during installation of the roof covering system. (R907.2) E�CISTING COVERING AS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 s l edges .� NO RUSTED METAL OR FLASHING: Existing vent flashing, ro usted R907.6) , drai outlets, collars or metal counter - flashing were not reinstalled if ❑ FLASHING 1NSTi ALLED PROPERLY: Flashing sha Nletal flashing to which ordance with approved manufacturers installation Instructions bituminous materials are to be adhered shall be primed prior to installation. (R907.6) /- 1j Signature of Primary lnstalle Date Signature of ermit Holder Date