Checkoff Sheet MS-2014-00314.tif I
2009 INTERNATIONAL RESIDENTI CODE
CITY OF BLAIR REROOFI CHECKOFF SHEET
Return to Blair City Hall prior to Fin I nspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing wort, please indicate compliance with the following requirements
following this reroofing job.
Permit #: r. '� 0- 1
Installation Date:
i
YES NO
' ® The materials and methods of application u led for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
® ICE PROTECTION INSTALLED An ice be rier that consists of at least two layers of
underiayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a r oint at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOU D: The structural roof components are
capable of sup the roof covering sys m and the material and equipment toads
p pp g
that will be encountered during installation f the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existling roof covering was removed for one
of the reasons required by section R907.3
i
NO RUSTED METAL OR FLASHING: Exis ing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing we not reinstalled if rusted. (R907.5)
i
FLASHING INSTALLED PROPERLY: Flas ing shall be reconstructed in accordance
with approved manufacturers installation In tractions. Metal flashing to which
bituminous materials are to be adhered she I be primed prior to installation. (R907.6)
Signature of Primary Insta er Date
Signature of . older Date
L'd Zn9-E9L-ZOtV asooW ft jooy a41 0 09: L L 9 L LO uer