Loading...
Checkoff Sheet MS-2014-00314.tif I 2009 INTERNATIONAL RESIDENTI CODE CITY OF BLAIR REROOFI CHECKOFF SHEET Return to Blair City Hall prior to Fin I nspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing wort, please indicate compliance with the following requirements following this reroofing job. Permit #: r. '� 0- 1 Installation Date: i YES NO ' ® The materials and methods of application u led for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ® ICE PROTECTION INSTALLED An ice be rier that consists of at least two layers of underiayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a r oint at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOU D: The structural roof components are capable of sup the roof covering sys m and the material and equipment toads p pp g that will be encountered during installation f the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existling roof covering was removed for one of the reasons required by section R907.3 i NO RUSTED METAL OR FLASHING: Exis ing vent flashing, metal edges, drain outlets, collars or metal counter - flashing we not reinstalled if rusted. (R907.5) i FLASHING INSTALLED PROPERLY: Flas ing shall be reconstructed in accordance with approved manufacturers installation In tractions. Metal flashing to which bituminous materials are to be adhered she I be primed prior to installation. (R907.6) Signature of Primary Insta er Date Signature of . older Date L'd Zn9-E9L-ZOtV asooW ft jooy a41 0 09: L L 9 L LO uer