Loading...
Checkoff Sheet MS-2014-00313.tif i 20 09 1N i L S1 1 CITY OF BLAIR REROOFIN CHECKOFF SHEET Return to Blair City Hall prier to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate co pliance with the following requirements following this reroofing job. Permit #: MS 90iq r Installation Date: YES NO ❑ The materials and methods of application ised for recovering or replacing the existing roof covering comply with the requirement of the budding code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice b rrier that consists of at least two layers of underlayment or of a self- adhering polym r modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7,1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I ❑ NO RUSTED METAL OR FLASHING: Ex sting vent flashing, metal edges, drain outlets, collars or metal counter- flashing ere not reinstalled if rusted. (R907.5) � ❑ FLASHING INSTALLED PROPERLY: FI shing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered sh�a11 be primed prior to installation. (8907.6) f� Signature of Primary Installer Date Signature of Permit Holder Date I Z -d Z8£9-£9L-ZOty asooW Oul 00j eyl 8 £V L L 9 L LO uer