Checkoff Sheet MS-2014-00313.tif i
20 09 1N i L S1 1
CITY OF BLAIR REROOFIN CHECKOFF SHEET
Return to Blair City Hall prier to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate co pliance with the following requirements
following this reroofing job.
Permit #: MS 90iq r
Installation Date:
YES NO
❑ The materials and methods of application ised for recovering or replacing the existing
roof covering comply with the requirement of the budding code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice b rrier that consists of at least two layers of
underlayment or of a self- adhering polym r modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7,1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
I
❑ NO RUSTED METAL OR FLASHING: Ex sting vent flashing, metal edges, drain
outlets, collars or metal counter- flashing ere not reinstalled if rusted. (R907.5)
� ❑ FLASHING INSTALLED PROPERLY: FI shing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered sh�a11 be primed prior to installation. (8907.6)
f�
Signature of Primary Installer Date
Signature of Permit Holder Date
I
Z -d Z8£9-£9L-ZOty asooW Oul 00j eyl 8 £V L L 9 L LO uer