Checkoff Sheet MS-2014-00296.tif i
INTERNATIONAL -I- RESIDENTIAL
CITY' OF LAIR REROOFII G CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection j
218S 1 6 th Street, B air, NE 68008
Because of limitations caused by the infeasibility tQ perform detailed inspections which would r
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #:
Installation Date.
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requireme is of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a in at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE S UND: The structural roof components are
capable of supporting the roof coverings stem and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
G COVERING WAS REMOVEDI Existing roof coverin
❑ EXISTIN V g g was removed for one
of the reasons required by section R907.3
❑ NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing ere not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY: Flais hing shalt be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered s iall be primed prior to installation. (R907.6)
a
Signature of Primary nstaller Date
Signature of Per older Date
Z'd Z888-£9L-Z0-V esooW 6ui ood aq I x'09 L L 9 Lo uar