Loading...
Checkoff Sheet MS-2014-00296.tif i INTERNATIONAL -I- RESIDENTIAL CITY' OF LAIR REROOFII G CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection j 218S 1 6 th Street, B air, NE 68008 Because of limitations caused by the infeasibility tQ perform detailed inspections which would r not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date. YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requireme is of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a in at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE S UND: The structural roof components are capable of supporting the roof coverings stem and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) G COVERING WAS REMOVEDI Existing roof coverin ❑ EXISTIN V g g was removed for one of the reasons required by section R907.3 ❑ NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing ere not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flais hing shalt be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered s iall be primed prior to installation. (R907.6) a Signature of Primary nstaller Date Signature of Per older Date Z'd Z888-£9L-Z0-V esooW 6ui ood aq I x'09 L L 9 Lo uar