Loading...
Checkoff Sheet MS-2014-03209.tif i i I 01/0512015 11:45 4025027575 C AND S ROOFING INC PAGE 20/20 201M. INTERNATIO.N. -L :R CITY OF BLAIRAEROOFING C Rctur'n to Blair City Hall prior t' Final inspection � 216 16 Street, Blair, NE 68008 E Because of limitations paused, by the infeasibility, to ,parf6rm detailed inspections-which would not interfere with reroofing work, please indicate compliance with the following requirements foil ing this reroofing job. Property Address: :L !Contractor or Homeowner (if self) : 1�1�� ��' � s � •� ' Kermit #; MS -201 4 Installation Date: YES NO j . . The materials and methods of application used for recove'ring.,or replaclnplhe existing, roof Covering comply with' the requlrements of (lRe biiiding code. (R907.:9y. ICE PROTECTION INSTALLED: An ice barrierthat consists of at least two layers of unddrlayment or of a self - adhering polymer modifie' d bitumen sheet was installed and extends at least from the eaveV -edge to a poifi J at least 24 itches inside the exterior wall line af'the building: (R905.2.7.1) ' C STRUCTU � ... • RAL COIVlPC1NENTS..ARE SQU.NI�. The'structurai rc�of.cci.rrmp.c�nents are cap'abie of supporting the ..rgof•,00vering systerri, land the. material and equipment loads that will be ehcou6tered during'ins#a:llatiori 'of the roof covering system, (8907.2) EXISTING COVERING WAS REMOVED: 1 AMi rg roof covering was removed for one of the reasons required by section 8907.3 Ci b !D NOT•USE RUSTED METAL .QR FLA'S.H. Existing.vent flashing, metal edges, drain outlets, collars or metal counter- flashing v Pre not reinstalled if rusted, "(R907.6) FLASHING INSTALLED PROPERLY: Flashin6, shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of a nstaller Cate • Signature of PernlY Holder ! Date . i d