Checkoff Sheet MS-2014-03209.tif i
i
I
01/0512015 11:45 4025027575 C AND S ROOFING INC PAGE 20/20
201M. INTERNATIO.N. -L :R
CITY OF BLAIRAEROOFING C
Rctur'n to Blair City Hall prior t' Final inspection �
216 16 Street, Blair, NE 68008
E
Because of limitations paused, by the infeasibility, to ,parf6rm detailed inspections-which would
not interfere with reroofing work, please indicate compliance with the following requirements
foil ing this reroofing job.
Property Address: :L
!Contractor or Homeowner (if self) : 1�1�� ��' � s � •� '
Kermit #; MS -201 4
Installation Date:
YES NO j
. . The materials and methods of application used for recove'ring.,or replaclnplhe existing,
roof Covering comply with' the requlrements of (lRe biiiding code. (R907.:9y.
ICE PROTECTION INSTALLED: An ice barrierthat consists of at least two layers of
unddrlayment or of a self - adhering polymer modifie' d bitumen sheet was installed and
extends at least from the eaveV -edge to a poifi J at least 24 itches inside the exterior
wall line af'the building: (R905.2.7.1) '
C
STRUCTU � ...
• RAL COIVlPC1NENTS..ARE SQU.NI�. The'structurai rc�of.cci.rrmp.c�nents are
cap'abie of supporting the ..rgof•,00vering systerri, land the. material and equipment loads
that will be ehcou6tered during'ins#a:llatiori 'of the roof covering system, (8907.2)
EXISTING COVERING WAS REMOVED: 1 AMi rg roof covering was removed for one
of the reasons required by section 8907.3
Ci b !D NOT•USE RUSTED METAL .QR FLA'S.H. Existing.vent flashing, metal edges,
drain outlets, collars or metal counter- flashing v Pre not reinstalled if rusted, "(R907.6)
FLASHING INSTALLED PROPERLY: Flashin6, shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of a nstaller Cate
•
Signature of PernlY Holder ! Date .
i d