Loading...
Checkoff Sheet MS-2014-03208.tif i 01105/2015 11:45 4025027575 C AND S ROOFING INC PAGE 19/20 Return to Blair City Hall prior to Final In ' pection 21 8 S 'i Street, Blair, NE 68808 Because of limitations caused by the infeasibility to - perform dotal-led'inspe�ctions which would not interfere with reroofing work, please Indicate compliance with the following requirements following this reroofing jots. i Property Address: - Contractor or Homeowner (if self) `� ��� T �`_. �= Qa , � JQ Permit #: MS -14 - Installation bate, ' Y S NO Q The.Materials,and methods of : application.used4or.recovering or rpp[ ping the existing roof covering comply with the requirements of the building, code. (F 9077 ) ICE PROTECTION INSTALLED: An ice harrier That consists of at least two layers of underlayment or of a �elf-adhering polymer mor ified*bitumen sheef' installed and extends at'least'feoni the eave's edge to a pblhti,at • least 24 irichas inside the exterior wall line of the building. (8905.2.7.1) i • ' STRUCTLI AL COMPONENTS ARE SOUND — T' he structural roof are capable of supporting the roof covering system. and the material and .equipment loads that will bo encountered' during instnllation 'of the roof covering system. (8907.2) ❑' EXISTING CQVERING WA5'REMOVED: Existl�ncd roof covering was removed for one df •the'reasona required by seeti6n 8907:3 _DlD NOT.USE RUSTED METAL, OR PLAS HING: Existing vent flashing, metal edges, drain outiets,.collars or metal. counter - flashing Were not. reinstalled'if rusted. (8907,5) FLASHING .INSTALL. ED. PROPERLY: Flashing;shall be reconstructed in accordance with approved manufacturer's installation instruc tions. Metal flashing to which bituminous rriaterials are to be adhered shall bel primed prior to Installation. (8907.6) Sigri' ur rim Insfiafler Date 81 44 ur rmit Holder Date'