Checkoff Sheet MS-2014-03208.tif i
01105/2015 11:45 4025027575 C AND S ROOFING INC PAGE 19/20
Return to Blair City Hall prior to Final In ' pection
21 8 S 'i Street, Blair, NE 68808
Because of limitations caused by the infeasibility to - perform dotal-led'inspe�ctions which would
not interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing jots. i
Property Address: -
Contractor or Homeowner (if self) `� ��� T �`_. �= Qa , � JQ
Permit #: MS -14 -
Installation bate, '
Y S NO
Q The.Materials,and methods of : application.used4or.recovering or rpp[ ping the existing
roof covering comply with the requirements of the building, code. (F 9077 )
ICE PROTECTION INSTALLED: An ice harrier That consists of at least two layers of
underlayment or of a �elf-adhering polymer mor ified*bitumen sheef' installed and
extends at'least'feoni the eave's edge to a pblhti,at • least 24 irichas inside the exterior
wall line of the building. (8905.2.7.1)
i •
' STRUCTLI AL COMPONENTS ARE SOUND — T' he structural roof are
capable of supporting the roof covering system. and the material and .equipment loads
that will bo encountered' during instnllation 'of the roof covering system. (8907.2)
❑' EXISTING CQVERING WA5'REMOVED: Existl�ncd roof covering was removed for one
df •the'reasona required by seeti6n 8907:3
_DlD NOT.USE RUSTED METAL, OR PLAS HING: Existing vent flashing, metal edges,
drain outiets,.collars or metal. counter - flashing Were not. reinstalled'if rusted. (8907,5)
FLASHING .INSTALL. ED. PROPERLY: Flashing;shall be reconstructed in accordance
with approved manufacturer's installation instruc tions. Metal flashing to which
bituminous rriaterials are to be adhered shall bel primed prior to Installation. (8907.6)
Sigri' ur rim Insfiafler Date
81 44 ur rmit Holder Date'