Loading...
Checkoff Sheet MS-2014-02919.tif i 01/05/2015 11:45 4025027575 G AND S ROOFING INC PAGE 17/20 RESIDEN 04`9 INTERNATIONAL • •1 ' ; E Return to Blair City Hill prior to, Final Inspection 218 S l8 Str6et, Blair, NE 68008 Because of limitations caused by the•irlfeasibility ter perfdrm detAlled inspections which would not interfare with reroofing work, please indicate compliance with the following requirements followinin this reroofing job. Property Address: t t ji Contractor or Homeowner (if self) Permim MS- 2014- r- Installation Deter' --�- YES NO The.materials and methods of, application used: or recovering or, replaclrig,,the existing roof covering., comply with the .requirements of the building' code: ICE PROTECTION INSTALLED An ice barrier hat consists of at least two Dyers of undedayrrrent "or of a self°adhering polymer modified bitumen sheet was installed and extends at least from the eaves edge to a p6inf a least 24 1 chef inside the exterior wall "lllne of the building. (R905.2:7.1) :.. STRUCTURAL CQMPONENt .ARE S0UND: he structural roof components are capable of supporting the roof covering system a' nd the,material and,equipment loads that will 6e encountered during installation of the roof'covering system. (11907.2) EXISTING COVERINg_M AS RELAOMED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL, OR FLASHING: L.Xisting vent fleshing, metal edges, drain outlets, collars or metal counter flashing, w're not..reinstalled if rusted. (8007.5) ® .> FLASHING INSTALL;ED'PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Mehl flashing to which bituminous materials are to be adhered shall be ?primed prior to installation. (8907,5) Signature of Prinfary In taller ; - Data I& Signature of Permit Holder Date i