Loading...
Checkoff Sheet MS-2014-02709.tif i i 01/05/2015 11:45 4025027575 G AND 5 ROOFING INC PAGE 16120 20,09: MTEKIVA "1 RE;'�JPENTIAL,CODE. i I Return to Blain Clty' Hall prior to' Final Inspection 218 S 18 Street, Blair, 111E 88008 Because of limitations caused by the infeasibility to perform detailed .inspections which would not interfere with reroofing work, please indicate complialpoe with the following requirements following this reroofing job. Property Address . t Contractor or Homeowner (if self) Permit # :. MS-2014 Installation= Date: YES NO The materials..,and methods of app.licatiomused -for recovenrig or replapin ,,the existing :.roof covering comply with the requirements tll : e building cede.:(R907.'l) i ICE PROTECTION INSTALLED An ice barrier that consists of at least two. layers of underlayrrtent or of a self- adh6ring polymer modified bitumen sheet was in=stalled and extends at least from the eave's edge to a pdint a# lea st 24 inches inside the exterior avail line of the building. '(R905.2.7.1) S.TR UCTURAL COMPONENTS ARE SOUND. � he,Mructural roof. components are capable of supporting the roof covering system end t.he,rnatgrjal and equipment loads that will be encountered during installation of the roof covering system. (11907.2) EXISTING COVERING WAS 'Ft5W10VED: Existing roof covering was removed for one Qf the reasotns required by section 'R9Q7.3 DID -NOT USE RUSTED mr AL.OR 1= LASI-IING:. Existing venit flashing, metal edges, drain outlets, collars or metal counterJiashing w+ not reinstalled if rusted. (1 997.5) .pre •I FLASHING INSTALLED :PROPERLY::Flashing;shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall belprimed prior to installation. (R.907.6) Signature of P ' [n t Her Date Signature o f Perm! older ! date )