Checkoff Sheet MS-2014-02709.tif i
i
01/05/2015 11:45 4025027575 G AND 5 ROOFING INC PAGE 16120
20,09: MTEKIVA "1 RE;'�JPENTIAL,CODE.
i
I
Return to Blain Clty' Hall prior to' Final Inspection
218 S 18 Street, Blair, 111E 88008
Because of limitations caused by the infeasibility to perform detailed .inspections which would
not interfere with reroofing work, please indicate complialpoe with the following requirements
following this reroofing job.
Property Address
. t
Contractor or Homeowner (if self)
Permit # :. MS-2014
Installation= Date:
YES NO
The materials..,and methods of app.licatiomused -for recovenrig or replapin ,,the existing
:.roof covering comply with the requirements tll : e building cede.:(R907.'l)
i
ICE PROTECTION INSTALLED An ice barrier that consists of at least two. layers of
underlayrrtent or of a self- adh6ring polymer modified bitumen sheet was in=stalled and
extends at least from the eave's edge to a pdint a# lea st 24 inches inside the exterior
avail line of the building. '(R905.2.7.1)
S.TR UCTURAL COMPONENTS ARE SOUND. � he,Mructural roof. components are
capable of supporting the roof covering system end t.he,rnatgrjal and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
EXISTING COVERING WAS 'Ft5W10VED: Existing roof covering was removed for one
Qf the reasotns required by section 'R9Q7.3
DID -NOT USE RUSTED mr AL.OR 1= LASI-IING:. Existing venit flashing, metal edges,
drain outlets, collars or metal counterJiashing w+ not reinstalled if rusted. (1 997.5)
.pre •I
FLASHING INSTALLED :PROPERLY::Flashing;shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall belprimed prior to installation. (R.907.6)
Signature of P ' [n t Her Date
Signature o f Perm! older ! date
)