Loading...
Checkoff Sheet MS-2014-02701.tif i 01105/2015 11:45 4025027575 C AND 5 ROOFING INC PAGE 15/20 0.0 ��JNTERP "'NA RE J D-ENTI L,C CITY4,OF BLAIR F :, ; Return to Blair C ity gil prior to' Final' Inspection 216 S 16 treet, lair, INE 66008 Because of limitations causedl by the infeasibility to perfgrm detailed inspectl''ons,which would not interfere with reroofing work, please inchoate complialpce with the following requirements following this reroofing job. i Property Address: Contractor or Homeowner (if self) : �_ Permit #: IVIS-2014- 01 Installation pate: LLn YES NO 13 The materials and, methods of:.application used lcr recovering or replacing -Jhe existing :roof covering comply with the requirements of the building. code:' (0C17 : j ) ICE PROTECTION INSTALLED An ice barrier that consists of at least two Dyers of under1*, yme'nt or of a sdlf adhering polymer modified bitumen sheet' s installed and extends at lust fron i the eave wipe to a point at least 'inches iriside the exterior will line of the i iullding. (8905.2.7.1) STRUCiURAL-c6IVmP+C NE'NTS ARE SOUND; :The structural roof co mponents are capable of.supporting the roof.covering system .and them aerial and.eguipment loads that will be encounter%d duririg installation of the roof ca�er'rng system. (8907.2) ExISTING COVERING WAS REMOVED: Exis ng roof covering was removed for one ' 6f the reasobs requir6d' by section R907.� Dll]:NO.T USE RUSTED 11111ETAL.bR PLASHING: Existing vent flashing, metal edges, drain outlets, collars . or. metal ..counter- filashing,w6re not, reinstalled if rusted. (14907.5) FLASHING INSTALLED PROPERLY; 1 °lashingf shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall bei primed prior to installation. (R907.6) Signature of Ptimary n taller bate I 1z D Signs ure of Per it Holder Date'