Checkoff Sheet MS-2014-02388.tif i
0110512015 11:45 4025027575 G AND S ROOFING INC PAGE 14120
,: WENT
20.09: INTERNATIOINALR
CODE
CITY.OfBL ; ,�I F , H; T
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, INE 88008
Because of limitations caused. by the irtfeaslb ity to per6rm detailed inspeeflons which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: y
C A
Contractor or Homeowner (if self)
Permit #:. IVI 7201 �
Installatiorii Date:
YES NO
The..materiats and methods of application.tised Tor, recovering or replaying the existing
.roof covering +comply with the requirements of tl.e,b.ullding,code. - (R9071) .
® ICI* PROTECTION INSTALLED: An ice barrier That consists of at least two Iayers of
underlayment or of a Wf adhering polymer mod,ified'bitumen sheet.was instal and
extends at least from the eaye's .edge to a point At least 24 inches inside the exterior
wall line of the building. '(R905..7,1)
STRUCTURAL COMPONENTS ARE 50U'ND: The structural roof.pomponents are
capable of supporting the roof covering system. anal the.materiai and .equipment loads
that will be encountered during lnstallatio' n of the roof covering system. (11907.2)
Q EXISTING COVERING WAS 'REMOVED: Existing roof covering was removed for one
of the reasons required by section' RA
DID NOT un RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal• counter flashing were not.•reinstalled if rust ed_ (8907.5)
FLASHING INSTALLED PROPERLY: Flashing; shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall bey primed prior to installation. (8907.6)
I 1 2 --N
Signatu iS of Print Ino ler Data
\ 2 I I--1
Signature I ermit 14older i Date
i •
�I