Loading...
Checkoff Sheet MS-2014-02294.tif i 0110512015 11:45 4025027575 C AND S ROOFING INC PAGE 13120 20. 9INTERNAT. CODE i r. .� „• I; OF,BLA RE - R0,0FING_CHECKQ.FF.,,8HEET Return to Blain City all prior to! Filial Inspection 2'1$ S 16 Street, Blair, NE 68008 Because, of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compllance with the fallowing requirements following this reroofing job. Property•Address: Y_1 :,: � � `�'� �) � ;' t.-�! 4 Contrac or Homeowner (if sel Permit #: MS -2014- C Y�q� Installation' Data: lao 1 N I YES )r O . The ,materials .and methods of application, used;ior recovering• or r� placing the existing I roof covering gomply with the requirements 6f tlye huitding., code, (k967.1) D ICE PR INSTA An ice barrier -t hat consists of at least two layers of undedayment or of a self-adhering pplymer modified 'bitumen sheet was installed and extends at least from the eave's edge to a pbintat least 24 niches inside the exterior Wall line of the buildinj. (R905.2.7A) i i D , S T , RUC TURAL OO MP.ONENT ARE SOUND: The structural roof com ponents are capable of.supporting the roof covering systom •and the %material and .equipment loads that will b6 encountered during installation of thO roof covering systeni. (R907.2) D EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required b y section 8007 .'3' D DID NOT ' USE RU STED METAL OR Existing vant, flashing, metal edges, drain outlets, cellars or metal counter - flashing vv�re not reinstalled if rusted. (8907.5) D • FLASHING 1NSTAL1,ED PROPERLY. Flashing! shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be! primed prior to installation. (R907.6) }Iz- c) `lL4 Signature of P i lost I r Date Signature of Permit Frolder Date:' i • I i