Checkoff Sheet MS-2014-02156.tif i
01/05/'2015 11:45 4025027575 C AND S ROOFING INC PAGE 12/20
2009 INTERNATIONAL RESIDENTIAL CODE
RE CHECKOFF SHEET
I
Return to Stair City Hall prior to Final inspection
i
21 S 1 6th Street, Blair, NS 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate cOmpliance with the following requirements
folt� Ina this reroofing job,
Property Address: r)
Contractor or Homeowner (if aeli
Permit #: MS - 2014- ig
Installation date:
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (1907.1)
ICE PROTECTION INSTALLED- An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ad a to a point at least 24 inches inside the exterior
wall line of the building. (R- 906.2.7.1)
i
STRUCTURAL COMPONENTS ARE
SOUND, The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
- EXISTING COVERING WAS REMOVED- Existing roof oovering was removed for one
of the reasons rewired by section 8907.3
JLIQ NOT USE RUSTED METAL OR FLASI-IiNG: Existing vent flashing, metal edges,
drain outlets, cellars or metal counter were not reinstalled if rusted. (8907.5)
FLASHING i NSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturers installation instructions. Metal flashing to which
ituminou.s raterials are to be adhered shall be primed prior to installation. (11907.1)
r 1 -: •--1 L4
Signs re f ri Installer date
Signat re of Pe it Haider v
Gate
i
i