Loading...
Checkoff Sheet MS-2014-02153.tif 0110512015 11:45 4025027575 C AND 5 ROOFING INC PAGE 11120 U REROOF otllairn to Blair Cit all p H CHECKOFF l� �' to prior to Final Inspection 218 '16 Street, Blair, NE 60000 UeC -1USe of limitatiOns caused by the Infeasibility to perform detailed inspections which would interfere with reroofing work, please indicate compliance with the following requirements folt�o this reroofing job, Property Address: OIL nc�, Contractor or Homeowner (if se Permit #: MS -2014 - Installation Gate: jq VWQ NO Q The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) I C E P lit:) ECTIQN INSTALLED: An icy; barrier that consists of at least two layers of � underlayment or of a self-adhering polymer mortified bitumen sheet was installed and extends at least from th oave� s edgft to a point at least 24 inches inside the exterior wall line of the building. (R905,2.7A) C3 STRUCTURAL COMPONENTS ARE SCiUND: The structural roof components are Capable of supporting the roof covering system, and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) MIS'TINQ COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.5 Dl[? NOT [SSE RUST6 METAL OR FLASHING: Existing vent ;flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted_ (11007.5) FL_A§HING INSTALLED PRO ERLY: FEashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous Materials are to be adhered shall be primed prior to installation. (R907_6) Signature of Pri ry ns i r pa #e t4 Signature of ermit older date v I