Loading...
Checkoff Sheet MS-2014-03282.tif 2009 NTERNATI RESIDENTIAL CODE CQIIT OF BLAIR REROOFING CHECKOFF SHEET I Return to Blair City all prior to in I Inspection 218S16 th Street, Blair, NE 68008 Because §f limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this eroofing job. J Property ddr ss: 33 L f N 1 0 St- 1 Contractor or omeowner (if self) : r Permit: 1 - ®3a8g, Installatin Date: ))— YES NQ T i e materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior W611 line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are c pable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one ol the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, d ain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance w th approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) !1- 1- 1N Signature of Pr Installer Date Signature Of Permit Holder Date