Loading...
Checkoff Sheet MS-2014-02675.tif 2009 NTERNATIONAL RESIDENTIAL CODE Return to I it ity Hall prior to i t Inspection 218S16 t " Street, Blair, Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following' this reroofing job. Property ddr ss: J r Contract r or omeowner (if self) : 1 0 C)a+r C S T 1 Yl Permit #.' - 1 - 0 , ' 1 U Installation Data: 15 - YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of ubderlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall lisle of the building. (R905.2.7.1) s'rRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads t at will be encountered during installation of the roof covering system. (R907.2) E (STING COVERING WAS REMOVED: Existing roof covering was removed for one i oi the reasons required by section R907.3 D D NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, d ain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) F A,SHING INSTALLED PROPERLY: Flashin g shall be reconstructed in accordance wth approved manufacturer's installation instructions. Metal flashing to which bi uminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature, of Pr mart' Ins —. Date IyIq Signature of P rmit Holder Date I