Loading...
Checkoff Sheet MS-2014-02183.tif . 2009 INTERNATIONAL N IAL CODE - CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall pr'lor to Final Inspection 218 S 16 Street, Blair, NE 68008 j Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin this reroofing job. Permit #: M8 -Abld - ml 6,3 Installation Date: YEV NO ! The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) r7l ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of ing polymer modified bitumen sheet was installed and underlayment or of a self adher extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which b' uminous mat lals are to be adhered shall be primed prior to installation. (11907. 6 } Date S!gnat re of PrIrAry Installer Date Sig ature o ermit Holder i