CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall pr'lor to Final Inspection
218 S 16 Street, Blair, NE 68008 j
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followin this reroofing job.
Permit #:
M8 -Abld - ml 6,3
Installation Date:
YEV NO !
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
r7l ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
ing polymer modified bitumen sheet was installed and
underlayment or of a self adher
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
b' uminous mat lals are to be adhered shall be primed prior to installation. (11907. 6 }
Date
S!gnat re of PrIrAry Installer
Date
Sig ature o ermit Holder