Loading...
Checkoff Sheet MS-2014-01230.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET . Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this- reroofing job. Property Address: _ C • Contractor or Homeowner (if self) lJi Permit #: MS -2014- Installation Date: _ 0 YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements 'of the .building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are capable of supporting the roof covering, system and the material and equipment loads that. will be encountered during installation of the roof covering* system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets collars or metal counter-flashing were not reinstalled if rusted. R907.5 ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) _9 gat g t o ima Insta er Date Si n Lure of Perm! older Date i