Loading...
Checkoff Sheet MS-2014-03239.tif i I 009 INTERNATI RESIDENTIAL COD CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would ! not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: w D /\( Contractor or Homeowner (if self) .,.J e C � � ���� �� � 6 Permit #: MS- 2014 - b 3 Installation Date: 1,c> e o �— L YES NO LU` ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) �® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) I ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ®o EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 �v ® DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which Qp� bituminous materials are to be adhered shall be primed prior to installation. (R907.6) 1 Signa a of Primary Installer Date i Signat of Permit Polder Date I