Loading...
Checkoff Sheet MS-2014-01242.tif I i 12/17/2014 13:46 FAX 4024277414 BENNETTS X1001 2009 UINTERINAT10"'NAL RESIDENTIAL CODE CITY OF I . REROOF10 , CHECKO'FF SHEET Return' to Blair City Hall prior to Final Inspections � 218 8 i6 Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would not interfere with reroofing work, please Indicates compliance with the following requirements following this reroofing job. Prop,i�rty Address; Contractor or Homeowner if self) Permit 9: M ; Installation Date; YE ISO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED, An Ice barrier that consists of at least, two layers of underlayment or of a self�adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a paint at least 24 inches insida the exterior wall line of the building, (R905,2.7.1) 1 STRUCTURAL COMPONENTS ARE SOUND•: The structural roof components are capable of supporting the roof covering system and the material gnd equipment loads that will be encountered during installation of the roof covering system. (8807.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one r . of the reasons requlred by section R907,3 DID NOT USE RUSTED METAL, OR FLASHING: Existing vent flashing, metal edges, draln outlets, collars or metal counter- flashing were not reinstalled if rusted. (8007,5) EL_A�HINO INSTALLED PROPERLY Flashing shall be reconstructed in accordance with approved manufacturer's Installation Instructions, Nlletal flashing to which bituminous materlals are to be adhered shall be primed prior to installation, (8907.6) Sign re of Primary Installer Date Signature of Permit Holder Date