Loading...
Checkoff Sheet MS-2014-01223.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET, Return to l lr City H all prior t Fin In 2 18 S 16 St reet, Blair, NE 6800 Because of limitations caused by the Infeasibility to perform detailed Inspections which would _ot interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. j VIt Property Address: IcC tl; i Contractor or Homeowner {if Siff} Permit - �14 �2 #: �- , _ , a Installation Data.... YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from t6a eya!s edge to a paint at least 24 Inches 1nsid+s the exterior wall line of the building. {11905.2.7.1} STRUCTURAL COLAPONlrNTS ARE SOUND The structural components are capable of supporting the roof covering system and the material and equipment leads that will be enWuntered during installation of the roof covering'system. 1 1907.2) j EXISTING COVERING AAS REMOVED: Existing roof covering was removed for one f of the reasons required by section 8907.3 DID NQT USE RUSTED METAL OR FLASMING: Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (R907.6) At I w pow FLASHING INSTALLED PROPELY: Hashing silo]] be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which I bituminous materials are to be adhered shall be primed prior to installation. {11907.6} Signatu of Primary Installer Date Signature of Permit Holder D to t