Checkoff Sheet MS-2014-01380.tif Dec 12 14 01:46p magis 0 p.2
L
i
i
i
INTERNAT RESIDENTIAL I
I
CITY OF 13LAIR VEROIDFING CHECKOFF SHEE
Return to Blair City (Hall prior to Final Inspection
I
2�8 S I Stroi:A, Blair, NE 08008
Because of limitations caused by t , ie infeasik imy to perform detailed inspections whii would
not interfere with reroofing work, p I -ease Ind gate compliance with the following requi � ents
following this reroofing job. Aq
Permit #: "' �' 2 dl — � � � � /� � 3
Installation Date.
YES NO
® The materials and me* As of application used for recovering or replacing the dsting
roof covering comply wi h the requ cements of she building code. (R907.1)
[ ® ICE PROTECTION INS /,,n ice barrier that consists of at least two is s of
underlayment or of a sE If-adhering polymer modified bitumen sheet was install. and
extends at least from ft eayds e c ge, to a point at least 24 inches Inslde thee erior
wall line of the building. i,R905.2.;'.'I) j
I� STRUCTURAL Ct7NlP , VI SOUND: The structural roof component are
capable of supporting the roof co system and the material and equipmet toads
that will be encounterec during in ;allation of the roof covering system. (R907,
[� (
EXISTING COVERING 'WAS REI DVED.- Existing root' covering was removec r one
of the reasons required by section R907.3
❑ NO RUSTED METAL ( I R FLASH -1,NG: Existing vent flashing, metal edges, dr
cutlets, collars or metal counter- fleshing were not reinstalled if rusted. (R907,
® FLASHING INSTALLE 1 PROP 1: ELY- Flashing shall be reconstructed in accc dance
with approved manufac I urer's ins t; illation instructions. Metal flashing to which
/�
bi #umin�ous mate ' Is ai . to be ac i,ered shall be primed prior to installation. ( 7.6)
r '
Sig of Pr' taller Date
/t4 -/ I
Signature of Permit Holder Date
I