Loading...
Checkoff Sheet MS-2014-00988.tif Dec. 12. 2014 4:18PM No. 1615 �P. ] j 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF ., SHEE Return to B lair City Hall prior to Fin Inspection 218S 'I Street B lair, HE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would ' not interfere with reroofing work, please indicate compliance with 'the fallowing requirements following this reroofing jab, r Property Address: 1 1 1 5 VO h ailk , i AX) Contractor or Homeowner (if self) p \J Permit #: MS 201 Q Installation Date: YE NO d The materiais and methods of application used for recovering 'or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ICE PRO l"ECTION INSTALLED: An, ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eav&s edue to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) i STRUCTURAL, COMPONENTS ARE SOUND..The structural roof components are capable r,? supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section,R907.3 DID NOT USE RUSTED MP-TAL OR FLASHING: Existing-vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) i FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907,6) nature of Prima stalier Date Signatu a of Permit H Ider Date I I i