Checkoff Sheet MS-2014-00786.tif 12/12/2014 10:25 FAX 4025352173 U001/001
RESIDEN 2 UN"TERNATIO'N"AL i
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to B lair City Hall prior to Find Inspection
218 S 16 S treet, Blair, NE 680
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements j
following this reroofing job.
f
Property Address:
Contractor or Homeowner (if self) ; �S i \ rc a
Permit #: MS-2014&0
Installation Date. Ll
YES NO
P . The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (890711)
r
Ll ICE PR OTECTION INSTALLED An Ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from_the_eave's edge . to a point At leas_t_24 inches inside the exterior
wail line of ?�e building, (8905.2,7.1)
Q
STRUCTURAL COMPONENTS ARE SOUND'; The structural roof comlionents are r
capable o! supporting the roof covering systerri and the material gnd equipment loads
that will be encountered during installation of the roof covering system. (14907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907,3
DID NOT USE RUSTED METAL OR FLASHING! Existing vent flashing, metal edges,
drain outlets, collars or metal counter flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be rec6nstructed in accordance
with approv6d manufacturer's Installation instructions. Metal flashing to which
bituminous Materials are to be adhered shall be primed prior to installation. (R907,6)
rgnature of Prima alter bate
Signature of hermit Molder
Date
I