Checkoff Sheet MS-2014-00441.tif i
I
12- 16 -'14 18:49 FROM- CP 'PILLAGE POINTE 4029557310 T -600 P0002/0002 F -580
RESIDENTIAL 200.9 INTERNATIONAL
CITY OF BLAIR REROOFING SHEET
Return to Blair City Hall prior to Final Inspection
21 1 Straat, Blair, 118 68000
Because of limitations caused by the infeasibility to perform detailed inspections whioh would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address:
Contractor or Homeowner (if self) ,
j
Permit #: MS-2014
Installation Date:
YES No
The materials and methods of application used for'recovering or replacing the existing
roof covering comply with the requirements of the building code, (11907.1)
ICE PRO rECT(ON INSTAJ.,LM, An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was inatalled and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building, (11905,2,7,1)
STRUCTURAL COMPONENTS ARE SOUND:. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTINC_GOVERINC WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NQT USE RUSTED OR FLASHING: Existing-vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (8907,0)
of. Primary Installer Date
Si i old - -- Late