Loading...
Checkoff Sheet MS-2014-00441.tif i I 12- 16 -'14 18:49 FROM- CP 'PILLAGE POINTE 4029557310 T -600 P0002/0002 F -580 RESIDENTIAL 200.9 INTERNATIONAL CITY OF BLAIR REROOFING SHEET Return to Blair City Hall prior to Final Inspection 21 1 Straat, Blair, 118 68000 Because of limitations caused by the infeasibility to perform detailed inspections whioh would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: Contractor or Homeowner (if self) , j Permit #: MS-2014 Installation Date: YES No The materials and methods of application used for'recovering or replacing the existing roof covering comply with the requirements of the building code, (11907.1) ICE PRO rECT(ON INSTAJ.,LM, An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was inatalled and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building, (11905,2,7,1) STRUCTURAL COMPONENTS ARE SOUND:. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTINC_GOVERINC WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NQT USE RUSTED OR FLASHING: Existing-vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation, (8907,0) of. Primary Installer Date Si i old - -- Late