Loading...
Checkoff Sheet MS-2014-00328.tif i Mar 08 00 03:33a LaHood Construction 402 553 -7952 p.1 2009 INTERN" ATIQ'N"AL I j . j ITT OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 2'18 S '16. Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirerrients following this reroofing job. Property Address Contractor or Homeowner (if se-If) Permit #: MS- 2014- Q _ Installation Date. - YES NO _ ❑ The materials and methods of application, used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) i ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two lagers of underlayment or of a self: adhering polymer modified bitumen sheet was installed and extends at least from theeave's ed e to a point at least 24 inches inside: the exterior -wall line of the building. (8905.2.7.1) ❑ STRUCTURAL CoMPQNENTS ARE SOUNI:I: The structural roof components are capable of supporting th6 roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (Re 07.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 - - - ❑ DID NOT USE RUSTED .NATAL OR PLASHING: Existing vent Flashing, metal edges, drain outlets, collars or metal cpunter- f lash ing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED! PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous Materials arelto be adhered shall be primed prior to installation. (R907.6) i ignatu of Primary Installer Date 12-- r Z nature f Permit Holder Date I i